A whole home renovation in Austin doesn’t have one price, because it isn’t one project. It’s a sequence: structure and systems first, then the rooms, then the finishes. What you pay is set by how much of each phase your house needs, and the first phase is the one nobody can price exactly until the walls are open. The honest way to budget is phase by phase, with a reserve held back for what the house reveals.
I’m Gazi Kose, owner of ATX Renovations. I’ve spent more than fifteen years in remodeling, much of it in the Austin and Hill Country housing stock. This guide walks through what a whole home scope includes, the order the work happens in, which phases you can live through, and how to budget so the number you start with is the number you finish near.
What does a whole home renovation cost in Austin?
It costs the sum of its phases, and the phases vary far more from house to house than any city average suggests. Two houses of the same size can land a long way apart. One needs paint, floors and a kitchen. The other needs a new electrical panel, rerouted plumbing and a wall moved before a single cabinet goes in.
The rooms give you the best anchor. A kitchen is usually the largest single line in a whole home budget, and our own published Austin kitchen tiers run from $35,000 to $60,000 for a finish update to $120,000 and up for a fully custom kitchen (our kitchen budget tiers). Bathrooms are the next largest, and we break those down by scope in our bathroom remodel cost guide. Add each room you’re changing, then add the shared work that touches the whole house: flooring through connected rooms, drywall and paint, lighting, and anything structural.
What a single average leaves out is the first phase. Structure and systems work is invisible when it’s done right and expensive when it’s skipped, and in an older house it’s where most budget surprises come from. That is why we price it on site, after a walkthrough, rather than from a table.
What is included in a whole home scope?
A whole home renovation means one plan, one schedule and one point of contact across several rooms, instead of a string of separate projects. On our whole home renovation projects, the scope usually covers:
- Layout and flow. Opening or moving walls, with a structural review before anything comes down.
- Kitchens and bathrooms. Usually the heart of the project and the largest share of the budget.
- Flooring and tile. Laid in a planned order so transitions between connected rooms line up.
- Drywall, paint and ceilings. Done once for the whole house rather than patched room by room.
- Built ins and storage. Cabinetry and millwork beyond the kitchen.
- Lighting and electrical. New circuits and fixtures, done by licensed electricians.
Not every house needs every line. The scope is set on the walkthrough, and it’s written down before any number is.
In what order is a whole home renovated?
The order is what keeps the cost under control. Work done out of sequence gets done twice: a new floor laid before a wall moves, or fresh drywall cut open again for a circuit nobody planned. This is the phase plan we use for a typical older Austin area house, and it doubles as the answer to whether you can stay.
| Phase | What it covers | Can you live through it? |
|---|---|---|
| Plan, select and order | Scope, finishes, permits, and ordering long lead items like cabinetry and stone | Yes. Nothing in the house changes yet |
| Protect and demolish | Sealing off rooms not being worked on, then removing what’s coming out | Hard. This is the dustiest, loudest stretch, and the one to be away for |
| Structure and rough in | Framing changes, load bearing walls, rough electrical and plumbing, inspections | Rarely in the rooms affected. Power and water may be shut off for parts of a day |
| Close up and surface | Insulation, drywall, flooring and tile, in a set order | Partly. Drywall sanding means dust again; finished rooms can be used |
| Install and finish | Cabinetry, millwork, countertops, fixtures, paint, final walkthrough | Usually yes, around the crew |
Construction typically starts 4 to 8 weeks after the contract is signed, because that’s how long the first phase takes to get permits confirmed and long lead materials ordered (our whole home renovation page). How long the rest takes depends on the scope and on what phase two uncovers, so we write the schedule for your house rather than quoting a typical one.
Can you live in the house during the work?
Sometimes, and the phase plan tells you when. For a true whole home renovation, moving out for at least the demolition and structural phases is usually the better call. You avoid the worst of the dust, the crew can shut off power and water when the work needs it, and an empty house is faster to work in, which takes some of the sting out of paying for somewhere else to stay.
Staying is more realistic when the work can be phased by zone. We keep one part of the house sealed and livable, with a working bathroom and somewhere to sleep, while another part is under construction, then switch. It takes longer and it asks more of the household, but plenty of families do it.
Three things push the decision toward moving out:
- Children, older family members or anyone with breathing problems. Demolition and drywall sanding put fine dust in the air even behind plastic sheeting.
- A house built before 1978. Paint in older homes can contain lead, and the EPA’s lead renovation, repair and painting rule requires firms paid to disturb painted surfaces in pre 1978 homes to be certified and to follow lead safe work practices.
- Suspect materials. Older flooring, ceiling texture and insulation can contain asbestos. The EPA’s guidance on protecting your family from asbestos is plain: material that will be disturbed should be inspected, and removal is work for a trained, accredited asbestos professional.
If you’re working from home, plan on being elsewhere during demolition even if you stay for the rest. That stretch is the hardest to work through.
How do you budget for what is found behind the walls?
By planning for it before it’s found. In older Austin area homes, the surprises come from the same places again and again: outdated plumbing, an electrical panel that can’t carry what a new kitchen needs, water damage behind tile, uneven floors, and earlier remodel work that wasn’t done right. We’ve written about the hidden costs in Austin remodels in detail, and on a whole home project they multiply, because every room is opened at once.
Three habits keep them from breaking the budget:
- Hold a contingency and don’t spend it on upgrades. Size it to the house: a newer home with recent systems needs less held back than an older one that has never had its wiring or plumbing updated. We set the figure with you after the walkthrough, based on what we can see and what the house’s age tells us.
- Do the structural review first. If a wall is load bearing or a floor needs leveling, it’s cheaper to know before finishes are ordered. Our construction and structural work covers framing, load bearing changes and coordination with a structural engineer or foundation specialist when the house needs one.
- Put every change in writing. On a project this size, small decisions add up. A documented change order with its price keeps the running total visible.
Permits belong in the budget too. The City of Austin lists permits for interior remodels, additions and demolition on its homeowner permitting resources page, and it notes that some insurers won’t cover work done without permits. We confirm which permits your scope needs during planning, not after demolition.
How do you choose a contractor for a project this size?
Look for someone who will run the whole sequence, not just a trade. A whole home renovation needs one person accountable for the schedule, the permits, the inspections and the order the trades come through. Ask each contractor you’re considering:
- Who manages the schedule, and how often will I hear from them? We check in weekly and put the timeline in writing.
- How do you price what you can’t see yet? A good answer names the contingency and how it’s used, not just a total.
- Who pulls the permits and schedules the inspections?
- How are change orders written and priced?
- Can I see a phased plan for my house before I sign?
An itemized estimate tells you more than a low one. If two bids are far apart, the gap is usually in what one of them left out.
Questions people ask us
How long does a whole home renovation take?
It depends on the scope and on what the structure and systems phase uncovers. The planning phase alone usually runs until construction starts, which is typically 4 to 8 weeks after signing (our whole home renovation page). We write a schedule for your specific house after the walkthrough rather than quoting a general one.
Is it cheaper to renovate in phases over several years?
Usually not overall. Spreading the work out means demolition, protection, permits and setup are paid for more than once, and later phases can disturb finished work. Phasing over years makes sense when cash flow requires it. If you go that way, do the structure and systems work first so nothing finished has to be opened again.
Do I need an architect for a whole home renovation in Austin?
Not always. If the layout stays largely the same, a design build contractor can plan the work. If you’re moving load bearing walls, adding space or changing the footprint, you’ll likely need a structural engineer, and an addition or a major layout change often benefits from an architect. We’ll tell you on the walkthrough which one your scope calls for.
How much contingency should I hold back?
Enough to cover what the house is likely to reveal, which depends on its age and on what’s already been updated. An older home with original plumbing and wiring needs a larger reserve than a newer one. We set the figure with you after the walkthrough, and we keep it separate from your finish budget so it’s there when it’s needed.
What to do next
The fastest way to a real number is to have the house looked at. We’ll walk every room with you, check the structure and systems we can see, talk through which phases you’d want to be out of the house for, and give you an itemized, phased estimate. Book a free whole home walkthrough and we’ll be in touch within one business day.