(512) 234-4004 · info@atxrenovations.comAustin-area luxury remodeling · 1775 County Rd 279 Suite A 101, Liberty Hill, TX 78642

Bathroom Remodeling

Bathroom Remodeling in Austin, TX

Calm, stone-led bathrooms with waterproofing and plumbing handled properly behind the walls.

Austin Bathrooms

A bathroom is judged by what you cannot see

The tile gets the compliments, but waterproofing, slope, ventilation and plumbing decide whether the room still looks good years from now. We plan the hidden work first and the finishes second. ATX Renovations is fully insured, and our founder is hands-on from the first visit to the last.

Wood vanity with a marble-look top, oval mirror and wall sconces over white subway tile, Lakeway bathroom

Approach

Bathroom remodeling built from the subfloor up

Water finds the weak point in any bathroom, so we treat the shower, the floor and the wall behind the vanity as a system. Substrate prep, membranes, drainage and ventilation are decided before a single tile is chosen, and they are inspected before they are covered.

That discipline lets the design side stay quiet and warm. Stone texture, soft light and clean detailing make a bathroom feel like a retreat rather than a clinic, and none of it holds up if the foundation of the work is rushed.

Gold vanity with towel shelf below a marble-look top, round brass mirror and patterned tile, Lakeway bath

Scope

Bathroom work we take on

Projects range from a single shower rebuild to a full primary suite.

Walk-in showers and glass

Curbless and low-threshold showers, custom niches, benches and frameless glass enclosures fitted to the finished tile.

Custom tile and stone

Large-format porcelain, marble and mosaic installations, with layouts planned so cuts land where they look intentional.

Vanities, storage and lighting

Custom vanities, millwork, mirrors and lit medicine cabinets, with lighting placed to flatter faces rather than flatten them.

Tubs and spa features

Freestanding and alcove tubs, rain heads, body sprays and heated floors, coordinated with plumbing and electrical early.

Small bathroom and guest bath updates

Compact rooms reward careful planning. Wall-hung vanities, recessed storage and a single continuous floor can make a small room feel larger.

Accessibility-minded layouts

Wider clearances, grab bar blocking, curbless entries and seated showers for homeowners who want to stay in their house comfortably.

Recent work

A look at what we have built.

Glass-enclosed tub with brass-tone shower fixtures, white subway tile and a tile niche, Lakeway bathroom

Waterproofing and Ventilation

The parts of a bathroom that do not show

A shower needs a continuous waterproof layer, a floor that slopes to the drain, and joints sealed where planes meet. We prefer to test and look before closing walls rather than trusting that it will be fine. Fan sizing and venting matter just as much, because a bathroom that stays damp breeds the problems that tile cannot fix.

Plumbing and electrical work is done with licensed professionals where the trade requires it. Moving a drain, adding a heated floor or relocating a vanity light each has consequences in the wall, and we scope them with those trades before pricing the job.

Process

How a bathroom project moves

Step 1

Consultation

We see the room, check for water damage or soft spots, and talk about how the bathroom is used and what you want to keep.

Step 2

Design and selections

Layout, tile, fixtures and glass are chosen and documented, so the plumber, tile setter and glass fabricator all work from the same plan.

Step 3

Pre-construction

Fixtures and tile are ordered and checked on arrival, since a wrong or damaged piece found mid-build stalls the job. Permit needs are confirmed here.

Step 4

Build

Demolition, rough plumbing and electrical, waterproofing, tile and finish work proceed in order, with a weekly check-in and written change orders.

Step 5

Reveal

A final walkthrough covers every fixture, seal and surface. You sign off when the room is finished to your standard.

Questions

Bathroom remodeling questions

Do I need a permit for a bathroom remodel in Austin?

It depends on the scope. Cosmetic work such as paint, new fixtures installed in the same spot and surface replacement may not need a building permit. Moving plumbing fixtures, changing walls, or adding or altering electrical and plumbing work usually does, and trade permits can apply even when a building permit does not. The City of Austin has a faster express review for some limited bathroom remodels. Rules also differ between Austin and nearby cities, so we confirm what applies to your address during pre-construction.

How long will my bathroom be out of service?

Typically longer than people expect, because waterproofing and tile setting need cure time between steps. The exact duration depends on scope and material lead times, and we give you a schedule before demolition begins.

Can you convert a tub into a walk-in shower?

Yes, this is one of the most common requests. We check the floor structure, drain location and wall condition first, since those determine whether the conversion is simple or needs more work.

What tile works best in a shower?

Porcelain is a dependable, low-maintenance choice, while natural stone is beautiful but needs sealing and care. Large-format tile means fewer grout lines. We show you the trade-offs with samples rather than pushing one option.

Can the bathroom be made safer for aging in place?

Yes. Curbless entries, seated showers, non-slip floor finishes and blocking in the walls for future grab bars can be built in without a clinical look.

Will you coordinate the plumber and electrician?

Yes. We manage the trades under one schedule, so you deal with one project team rather than coordinating separate contractors yourself.

Related

More from ATX Renovations

A look at our bathroom project and the services that often go with it.

Lakeway spa bath

The spa bath direction we developed for a Lakeway home.

Kitchen remodeling

Remodeling the kitchen too? We can plan both under one schedule.

Full home renovations

For bathrooms that are part of a larger renovation.

Our process

The five steps every ATX project follows.

Next Step

Planning a bathroom remodel?

Send us the room, the scope and your timing. A member of the team replies within 1 business day.