(512) 234-4004 · info@atxrenovations.comAustin-area luxury remodeling · 1775 County Rd 279 Suite A 101, Liberty Hill, TX 78642

Build

Construction & Structural

Permitted structural work, framing, ceilings and load-bearing changes.

Construction & Structural

Permitted structural work, done right.

Framing, demolition, foundation coordination and the structural work behind every successful remodel.

Licensed, insured and permit-aware — the foundation of any architectural renovation.

What we build

Every detail, planned together.

Flooring

Hardwood, tile and engineered flooring with substrate prep done right.

Tile Installation

Large-format porcelain, mosaic and waterproofed wet areas.

Drywall & Framing

Wall framing, ceilings and load-bearing changes done with precision.

Foundation Coordination

Foundation repair scheduling and structural engineer coordination.

Recent work

A look at what we have built.

Ready to start?

Build the foundation.

Share the space, scope and timeline. We will guide the fit and the next conversation with clarity.

Construction & structural

The hidden work determines how premium the visible work feels.

Flooring, tile, drywall, framing, demolition and foundation repair coordination handled with the planning discipline needed to protect finish work.

Details

What this page covers.

Flooring & tile

Subfloor planning, waterproofing, layout discipline and transitions.

Drywall & framing

Selective demo, wall repair, framing adjustments and finish-ready surfaces.

Foundation coordination

Responsible support and coordination around specialists when structural conditions require it.

Not just finishes

Not just finishes

Premium remodeling depends on the work behind the wall, under the floor and before the tile is set.

Clean coordination

Clean coordination

ATX keeps construction and finish decisions connected so the final room does not inherit avoidable problems.

Scope planning

ATX keeps construction and finish decisions connected so the final room does not inherit avoidable problems.

Material direction

ATX keeps construction and finish decisions connected so the final room does not inherit avoidable problems.

Trade coordination

ATX keeps construction and finish decisions connected so the final room does not inherit avoidable problems.

Next step

Tell ATX what you want this space to become.

Start with a clear conversation about scope, priorities, timing, materials and fit. The goal is a remodel that feels calm before it becomes beautiful.